ITAC Assessment: MO0059
ITAC logo
ITAC Assessment: MO0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DRESS/CASUAL HATS
NAICS
n/a
SIC 2353: Hats, Caps, and Millinery
Sales Range $5
M
to 10
M
# of Employees 192
Plant Area
n/a
Annual Production 2,280,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,775 1,376,319
kWh
Natural Gas $43,059 10,609
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,984

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $2,446 $300 - $2,446
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $295 $500 - $295
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,545 $20 $2,545
35,463
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,167 $395 $1,167
16,413
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $536 $96 $536
7,620
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,670 $10,000 $3,670
51,290
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,316 $630 $1,466
20,516
kWh
- $(-150.0)
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $91 $573 $91
1,172
kWh
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $335 - $335
4,689
kWh
- -
10 2.7261: Install timers and/or thermostats $7,318 $2,638 $7,318
101,993
kWh
- -
11 3.4115: Recover and reuse cooling water $528 - $75
1,172
kWh
- $453
TOTAL RECOMMENDED $20,247 $15,152 $17,203
240,328
kWh
$2,741
-
MMBtu
$303
TOTAL IMPLEMENTED $6,984 $11,621 $6,839
95,839
kWh
$295
-
MMBtu
$(-150.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs