ITAC Assessment: MO0052
ITAC logo
ITAC Assessment: MO0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product GAS HEATERS AND GRILLS
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 30,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,457 1,889,215
kWh
LPG $3,650 488
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $413

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $11,378 $300 - $11,378
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $264 $860 $534
13,189
kWh
- $(-270.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $147 $4,150 $147
3,517
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $292 $20 $292
7,327
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $200 $190 $200
4,982
kWh
- -
06 2.4312: Improve lubrication practices $213 $435 $213
5,275
kWh
- -
07 2.7494: Install storm windows and doors $196 $435 - $196
-
MMBtu
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $43 - $43
1,172
kWh
- -
TOTAL RECOMMENDED $12,733 $6,390 $1,429
35,462
kWh
$11,574
-
MMBtu
$(-270.0)
TOTAL IMPLEMENTED $413 $625 $413
10,257
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs