Assessment Year | 1992 |
---|---|
Principal Product | GAS HEATERS AND GRILLS |
NAICS |
n/a
|
SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $76,457 | 1,889,215 |
kWh
|
$0.040 |
LPG | $3,650 | 488 |
MMBtu
|
$7.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,733 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $413 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $11,378 | $300 | - |
$11,378
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $264 | $860 |
$534
13,189
kWh
|
- | $(-270.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $147 | $4,150 |
$147
3,517
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $292 | $20 |
$292
7,327
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $200 | $190 |
$200
4,982
kWh
|
- | - | |
06 | 2.4312: Improve lubrication practices | $213 | $435 |
$213
5,275
kWh
|
- | - | |
07 | 2.7494: Install storm windows and doors | $196 | $435 | - |
$196
-
MMBtu
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $43 | - |
$43
1,172
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,733 | $6,390 |
$1,429
35,462
kWh
|
$11,574
-
MMBtu
|
$(-270.0) | ||
TOTAL IMPLEMENTED | $413 | $625 |
$413
10,257
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs