Assessment Year | 1992 |
---|---|
Principal Product | WIRING DEVICES |
NAICS |
n/a
|
SIC | 3644: Noncurrent-Carrying Wiring Devices |
Sales Range | $50 M to 100M |
# of Employees | 450 |
Plant Area |
n/a
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,523,679 | 25,356,976 |
kWh
|
$0.060 |
Natural Gas | $407,579 | 27,968 |
MMBtu
|
$14.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,294 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,637 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,099 | $19,338 |
$3,099
51,583
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,779 | $6,779 |
$6,779
112,837
kWh
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,008 | $1,195 | - |
$10,008
-
MMBtu
|
- | |
04 | 2.2135: Repair and eliminate steam leaks | $321 | $100 | - |
$321
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,430 | $2,109 |
$3,430
57,151
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,937 | - |
$2,740
45,721
kWh
|
- | $(-803.0) | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $345 | $542 |
$345
5,862
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $120 | - |
$120
2,052
kWh
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $4,255 | $4,225 |
$4,255
70,926
kWh
|
- | - | |
TOTAL RECOMMENDED | $30,294 | $34,288 |
$20,768
346,132
kWh
|
$10,329
-
MMBtu
|
$(-803.0) | ||
TOTAL IMPLEMENTED | $23,637 | $29,521 |
$13,308
221,571
kWh
|
$10,329
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs