ITAC Assessment: TT0016
ITAC logo
ITAC Assessment: TT0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Steel Caskets
NAICS 339995: Burial Casket Manufacturing
SIC 3995: Burial Caskets
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 500,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $691,892 20,139,222
kWh
Electricity Demand $320,911 36,395
kW-mo/yr
Electricity Fees $100,000 -
Natural Gas $1,020,796 96,766
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,882 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,953

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $17,400 $50,000 - $17,400 -
02 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $5,929 $1,500 $5,929
147,670
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,553 $42,900 $21,553
640,886
kWh
- -
04 2.2437: Recover waste heat from equipment $19,000 $19,750 - - $19,000
-
MMBtu
TOTAL RECOMMENDED $63,882 $114,150 $27,482
788,556
kWh
$17,400 $19,000
-
MMBtu
TOTAL IMPLEMENTED $38,953 $92,900 $21,553
640,886
kWh
$17,400 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs