Assessment Year | 2008 |
---|---|
Principal Product | Steel Caskets |
NAICS | 339995: Burial Casket Manufacturing |
SIC | 3995: Burial Caskets |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
500,000
ft2
|
Annual Production | 300,000
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $691,892 | 20,139,222 |
kWh
|
$0.034 |
Electricity Demand | $320,911 | 36,395 |
kW-mo/yr
|
$8.82 |
Electricity Fees | $100,000 | - |
|
- |
Natural Gas | $1,020,796 | 96,766 |
MMBtu
|
$10.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,882 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,953 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $17,400 | $50,000 | - | $17,400 | - | |
02 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $5,929 | $1,500 |
$5,929
147,670
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,553 | $42,900 |
$21,553
640,886
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $19,000 | $19,750 | - | - |
$19,000
-
MMBtu
|
|
TOTAL RECOMMENDED | $63,882 | $114,150 |
$27,482
788,556
kWh
|
$17,400 |
$19,000
-
MMBtu
|
||
TOTAL IMPLEMENTED | $38,953 | $92,900 |
$21,553
640,886
kWh
|
$17,400 | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs