ITAC Assessment: MO0048
ITAC logo
ITAC Assessment: MO0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product WIRE PRODUCTS
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 2,400,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,625 1,711,606
kWh
LPG $82,068 15,692
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,183

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $677 $755 $677
12,896
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,646 - $1,646
31,360
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,770 $40 $1,770
33,705
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,183 $292 $1,183
22,567
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $313 $507 $313
5,862
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $890 $283 $993
19,050
kWh
$(-103.0)
TOTAL RECOMMENDED $6,479 $1,877 $6,582
125,440
kWh
$(-103.0)
TOTAL IMPLEMENTED $1,183 $292 $1,183
22,567
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs