ITAC Assessment: AM0410
ITAC logo
ITAC Assessment: AM0410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Industrial organic chemical processing
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area
n/a
Annual Production 300,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,418 7,572,345
kWh
Electricity Demand $78,460 12,665
kW-mo/yr
Electricity Fees $5,880 -
Natural Gas $2,153,230 465,324
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $161,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2162: Reduce excess steam bleeding $122,870 $40,000 - - $122,870
-
MMBtu
-
02 2.2113: Repair or replace steam traps $22,100 $580 - - $22,100
-
MMBtu
-
03 2.8121: Apply for tax-free status for energy purchases $8,240 $4,120 - - - $8,240
04 2.2511: Insulate bare equipment $5,060 $1,120 - - $5,060
-
MMBtu
-
05 2.2135: Repair and eliminate steam leaks $980 $250 - - $980
-
MMBtu
-
06 2.4314: Use synthetic lubricant $1,400 - $1,010
23,555
kWh
$390
-
kW-mo/yr
- -
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $420 - $420
9,760
kWh
- - -
TOTAL RECOMMENDED $161,070 $46,070 $1,430
33,315
kWh
$390
-
kW-mo/yr
$151,010
-
MMBtu
$8,240
TOTAL IMPLEMENTED $28,560 $1,950 $420
9,760
kWh
- $28,140
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs