ITAC Assessment: MO0046
ITAC logo
ITAC Assessment: MO0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product UNIFORMS
NAICS
n/a
SIC 2326: Men's and Boys' Work Clothing
Sales Range $5
M
to 10
M
# of Employees 180
Plant Area
n/a
Annual Production 960,000
pieces
Production Hrs. Annual 2,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,648 1,429,367
kWh
LPG $23,857 3,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,508

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $6,716 - $195
3,517
kWh
- $6,521
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,923 $586 $2,314
43,083
kWh
- $(-391.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $630 $270 $630
11,723
kWh
- -
04 2.2511: Insulate bare equipment $3,213 $672 $3,213
59,789
kWh
- -
05 2.4133: Use most efficient type of electric motors $227 $1,800 $227
4,103
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $76 - $76
1,465
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,132 $1,700 - $1,132
-
MMBtu
-
08 2.4221: Install compressor air intakes in coolest locations $376 $234 $376
7,034
kWh
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $181 $20 $181
3,517
kWh
- -
TOTAL RECOMMENDED $14,474 $5,282 $7,212
134,231
kWh
$1,132
-
MMBtu
$6,130
TOTAL IMPLEMENTED $1,508 $1,934 $376
7,034
kWh
$1,132
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs