Assessment Year | 1991 |
---|---|
Principal Product | ELECTRICAL COMPONENTS |
NAICS |
n/a
|
SIC | 3644: Noncurrent-Carrying Wiring Devices |
Sales Range | $50 M to 100M |
# of Employees | 405 |
Plant Area |
n/a
|
Annual Production | 2,800,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $241,971 | 3,700,469 |
kWh
|
$0.065 |
Natural Gas | $77,015 | 17,004 |
MMBtu
|
$4.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,304 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,304 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $20,836 | $26,565 | - |
$20,836
-
MMBtu
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $4,584 | $561 |
$4,584
70,926
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,455 | $20 |
$4,455
68,875
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,326 | - |
$3,050
46,600
kWh
|
- | $(-724.0) | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,260 | $2,690 |
$1,260
19,637
kWh
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $271 | $411 |
$271
4,103
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $612 | - |
$612
9,379
kWh
|
- | - | |
08 | 2.4312: Improve lubrication practices | $2,256 | $528 |
$2,256
34,877
kWh
|
- | - | |
09 | 2.7494: Install storm windows and doors | $7,704 | $5,952 | - |
$7,704
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $44,304 | $36,727 |
$16,488
254,397
kWh
|
$28,540
-
MMBtu
|
$(-724.0) | ||
TOTAL IMPLEMENTED | $44,304 | $36,727 |
$16,488
254,397
kWh
|
$28,540
-
MMBtu
|
$(-724.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs