ITAC Assessment: MO0044
ITAC logo
ITAC Assessment: MO0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ELECTRICAL COMPONENTS
NAICS
n/a
SIC 3644: Noncurrent-Carrying Wiring Devices
Sales Range $50
M
to 100
M
# of Employees 405
Plant Area
n/a
Annual Production 2,800,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,971 3,700,469
kWh
Natural Gas $77,015 17,004
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $20,836 $26,565 - $20,836
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $4,584 $561 $4,584
70,926
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,455 $20 $4,455
68,875
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,326 - $3,050
46,600
kWh
- $(-724.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,260 $2,690 $1,260
19,637
kWh
- -
06 2.4133: Use most efficient type of electric motors $271 $411 $271
4,103
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $612 - $612
9,379
kWh
- -
08 2.4312: Improve lubrication practices $2,256 $528 $2,256
34,877
kWh
- -
09 2.7494: Install storm windows and doors $7,704 $5,952 - $7,704
-
MMBtu
-
TOTAL RECOMMENDED $44,304 $36,727 $16,488
254,397
kWh
$28,540
-
MMBtu
$(-724.0)
TOTAL IMPLEMENTED $44,304 $36,727 $16,488
254,397
kWh
$28,540
-
MMBtu
$(-724.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings