ITAC Assessment: MO0043
ITAC logo
ITAC Assessment: MO0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FIRE BRICK
NAICS
n/a
SIC 3255: Clay Refractories
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area
n/a
Annual Production 7,700,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $398,558 6,282,532
kWh
Natural Gas $407,446 166,560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $28,978 - $216
3,517
kWh
$28,762
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,765 - $7,765
122,509
kWh
-
03 2.4133: Use most efficient type of electric motors $1,143 $2,738 $1,143
17,878
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,499 - $1,581
24,912
kWh
$(-82.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $376 $300 $376
5,862
kWh
-
06 2.4321: Upgrade obsolete equipment $2,924 - $2,924
46,014
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $7,518 $416 $7,518
118,406
kWh
-
TOTAL RECOMMENDED $50,203 $3,454 $21,523
339,098
kWh
$28,680
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs