ITAC Assessment: MO0039
ITAC logo
ITAC Assessment: MO0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FRUIT DRINKS
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 182
Plant Area
n/a
Annual Production 18,000,000
pieces
Production Hrs. Annual 6,656
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $443,738 7,025,205
kWh
Natural Gas $110,987 28,774
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,122 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6231: Utilize controls to operate equipment only when needed $99,399 $8,205 $99,399
1,573,857
kWh
02 2.4133: Use most efficient type of electric motors $1,998 $2,883 $1,998
31,653
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $324 - $324
5,275
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,824 $307 $1,824
29,015
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $252 $537 $252
4,103
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,325 $551 $1,325
21,102
kWh
TOTAL RECOMMENDED $105,122 $12,483 $105,122
1,665,005
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs