ITAC Assessment: MO0034
ITAC logo
ITAC Assessment: MO0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product VITREOUS CHINA PLUMBING
NAICS
n/a
SIC 3261: Vitreous China Plumbing Fixtures and China and Earthenware Fittings and Bathroom Accessories
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 350,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,403 4,467,761
kWh
Natural Gas $285,910 104,839
MMBtu
LPG $3,762 1,049
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $787 $1,441 $787
15,240
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $783 - $1,543
55,979
kWh
$(-760.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,165 $21,000 $1,165
22,274
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,140 $9 $2,140
41,032
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $981 $336 $981
18,757
kWh
-
TOTAL RECOMMENDED $5,856 $22,786 $6,616
153,282
kWh
$(-760.0)
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs