ITAC Assessment: MO0027
ITAC logo
ITAC Assessment: MO0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BUNK BEDS AND HEADBOARDS
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 227,295
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,844 3,118,406
kWh
Wood $1,440 57,223
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,585 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,585

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.4133: Use most efficient type of electric motors $673 $2,931 $673
13,482
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $3,705 - $3,705
74,150
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,369 $288 $1,369
27,550
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $318 $549 $318
6,448
kWh
-
05 2.2627: Use multiple-effect evaporators $978 - $978
19,637
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $102 $701 $102
2,052
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,440 $300 - $1,440
-
MMBtu
TOTAL RECOMMENDED $8,585 $4,769 $7,145
143,319
kWh
$1,440
-
MMBtu
TOTAL IMPLEMENTED $8,585 $4,769 $7,145
143,319
kWh
$1,440
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs