Assessment Year 1991
Principal Product CUSTOM LIMOUSINES
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area
n/a
Annual Production 250
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,028 186,401
kWh
Natural Gas $12,009 2,534
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,226 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,226

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $536 $138 $536
9,965
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $256 $339 - $256
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $76 $253 $76
1,465
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $220 $522 $220
4,103
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $99 $20 $99
1,758
kWh
-
06 2.4312: Improve lubrication practices $39 - $39
879
kWh
-
TOTAL RECOMMENDED $1,226 $1,272 $970
18,170
kWh
$256
-
MMBtu
TOTAL IMPLEMENTED $1,226 $1,272 $970
18,170
kWh
$256
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs