ITAC Assessment: MO0019
ITAC logo
ITAC Assessment: MO0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CUSTOMIZED TOOLS & DIES
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 330
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,720
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,273 2,895,955
kWh
LPG $11,292 3,045
MMBtu
Fuel Oil #2 $5,088 980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2511: Insulate bare equipment $7,812 $1,907 $4,489
83,529
kWh
$3,323
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $720 $749 $720
18,171
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,883 $564 $2,883
53,634
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,233 $340 $1,233
22,860
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $877 $20 $877
16,413
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $455 $995 - $455
-
MMBtu
TOTAL RECOMMENDED $13,980 $4,575 $10,202
194,607
kWh
$3,778
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs