| Assessment Year | 1991 |
|---|---|
| Principal Product | CUSTOMIZED TOOLS & DIES |
| NAICS |
n/a
|
| SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
| Sales Range | $10 M to 50M |
| # of Employees | 330 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 5,720
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $155,273 | 2,895,955 |
kWh
|
$0.054 |
| LPG | $11,292 | 3,045 |
MMBtu
|
$3.71 |
| Fuel Oil #2 | $5,088 | 980 |
MMBtu
|
$5.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,980 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $7,812 | $1,907 |
$4,489
83,529
kWh
|
$3,323
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $720 | $749 |
$720
18,171
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,883 | $564 |
$2,883
53,634
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,233 | $340 |
$1,233
22,860
kWh
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $877 | $20 |
$877
16,413
kWh
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $455 | $995 | - |
$455
-
MMBtu
|
|
| TOTAL RECOMMENDED | $13,980 | $4,575 |
$10,202
194,607
kWh
|
$3,778
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs