ITAC Assessment: MO0018
ITAC logo
ITAC Assessment: MO0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product TOASTERS & TOASTER OVENS
NAICS
n/a
SIC 3634: Electric Housewares and Fans
Sales Range $50
M
to 100
M
# of Employees 490
Plant Area
n/a
Annual Production 2,518,325
pieces
Production Hrs. Annual 3,875
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $359,430 6,422,919
kWh
Natural Gas $100,141 30,624
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,764

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,073 $542 $9,073
159,730
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,564 $1,000 - $2,564
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $426 $757 $426
7,620
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,232 $315 $1,232
21,688
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $469 $700 $469
8,206
kWh
-
TOTAL RECOMMENDED $13,764 $3,314 $11,200
197,244
kWh
$2,564
-
MMBtu
TOTAL IMPLEMENTED $13,764 $3,314 $11,200
197,244
kWh
$2,564
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs