ITAC Assessment: MO0017
ITAC logo
ITAC Assessment: MO0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CHICKEN PATTIES
NAICS
n/a
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area
n/a
Annual Production 33,000
ton
Production Hrs. Annual 5,040
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $608,508 11,781,067
kWh
Natural Gas $198,524 62,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,798 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $31,939 - - - $31,939
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $17,734 $5,100 $17,734
343,494
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $705 $1,087 $705
13,775
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,750 $570 $1,750
33,998
kWh
- -
05 3.4151: Minimize water usage $1,269 - - $500
-
MMBtu
$769
06 2.4221: Install compressor air intakes in coolest locations $1,117 $220 $1,117
21,688
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $698 $1,195 - $698
-
MMBtu
-
08 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $586 $40 $586
11,430
kWh
- -
TOTAL RECOMMENDED $55,798 $8,212 $21,892
424,385
kWh
$1,198
-
MMBtu
$32,708
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs