Assessment Year | 1991 |
---|---|
Principal Product | CHICKEN PATTIES |
NAICS |
n/a
|
SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
n/a
|
Annual Production | 33,000
ton
|
Production Hrs. Annual | 5,040
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $608,508 | 11,781,067 |
kWh
|
$0.052 |
Natural Gas | $198,524 | 62,909 |
MMBtu
|
$3.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,798 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 3.4115: Recover and reuse cooling water | $31,939 | - | - | - | $31,939 | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $17,734 | $5,100 |
$17,734
343,494
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $705 | $1,087 |
$705
13,775
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,750 | $570 |
$1,750
33,998
kWh
|
- | - | |
05 | 3.4151: Minimize water usage | $1,269 | - | - |
$500
-
MMBtu
|
$769 | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,117 | $220 |
$1,117
21,688
kWh
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $698 | $1,195 | - |
$698
-
MMBtu
|
- | |
08 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $586 | $40 |
$586
11,430
kWh
|
- | - | |
TOTAL RECOMMENDED | $55,798 | $8,212 |
$21,892
424,385
kWh
|
$1,198
-
MMBtu
|
$32,708 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs