ITAC Assessment: MO0015
ITAC logo
ITAC Assessment: MO0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CLEANING MACHINERY
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $5
M
to 10
M
# of Employees 95
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,597 1,121,043
kWh
LPG $18,172 4,360
MMBtu
Fuel Oil #4 $8,573 2,478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,577 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $548

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $670 $352 $670
8,206
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $359 $753 $359
4,396
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $448 - $448
5,569
kWh
04 2.4221: Install compressor air intakes in coolest locations $100 $60 $100
1,172
kWh
TOTAL RECOMMENDED $1,577 $1,165 $1,577
19,343
kWh
TOTAL IMPLEMENTED $548 $60 $548
6,741
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs