ITAC Assessment: MI0424
ITAC logo
ITAC Assessment: MI0424
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Flower arrangement
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 120
Plant Area 100,805
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,310 2,379,958
kWh
Electricity Demand $60,091 5,189
kW-mo/yr
Electricity Fees $93,619 -
Fuel Oil #2 $1,560,000 54,653
MMBtu
Waste Disposal Costs
Water Usage $24,016 2,848
Tgal
Water Disposal $4,880 488
Tgal
TOTAL YEARLY COSTS $1,893,916
RECOMMENDED SAVINGS* $52,308 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,522

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.8226: Increase efficiency of trucks $32,721 $6,400 - - $28,971
-
MMBtu
$3,750
02 2.8114: Change rate schedules or other changes in utility service $6,951 $120 - - - $6,951
03 2.6218: Turn off equipment when not in use $5,328 - $5,328
83,251
kWh
- - -
04 2.7221: Lower temperature during the winter season and vice-versa $4,786 $580 $4,786
74,778
kWh
- - -
05 2.7444: Close holes and openings in building such as broken windows $2,147 $118 $1,719
26,854
kWh
$428
-
kW-mo/yr
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $375 $1,215 $221
3,467
kWh
$154
-
kW-mo/yr
- -
TOTAL RECOMMENDED $52,308 $8,433 $12,054
188,350
kWh
$582
-
kW-mo/yr
$28,971
-
MMBtu
$10,701
TOTAL IMPLEMENTED $47,522 $7,853 $7,268
113,572
kWh
$582
-
kW-mo/yr
$28,971
-
MMBtu
$10,701
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs