ITAC Assessment: SF0011
ITAC logo
ITAC Assessment: SF0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Tanned Leather Hides
NAICS
n/a
SIC 3111: Leather Tanning and Finishing
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 122,000
ft2
Annual Production 1,700
thousand feet
Production Hrs. Annual 7,980
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $450,735 5,041,618
kWh
Natural Gas $327,679 103,343
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $8,995 $8,906 $8,995
100,528
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,099 $7,545 $6,099
68,288
kWh
-
03 2.7134: Use photocell controls $2,330 $2,338 $2,330
26,084
kWh
-
04 2.2136: Install / repair insulation on steam lines $4,893 $4,244 - $4,893
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,482 $1,500 $3,482
38,980
kWh
-
06 2.2511: Insulate bare equipment $3,165 $8,401 - $3,165
-
MMBtu
TOTAL RECOMMENDED $28,964 $32,934 $20,906
233,880
kWh
$8,058
-
MMBtu
TOTAL IMPLEMENTED $26,634 $30,596 $18,576
207,796
kWh
$8,058
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs