Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Landing Gear/ Aircraft
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 192
Plant Area 100,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,621 6,943,183
kWh
Electricity Demand $219,647 13,106
kW-mo/yr
Electricity Fees $85,160 -
Natural Gas $3,073 230
MMBtu
Waste Disposal Costs
Water Usage $25,691 1,653
Tgal
Water Disposal $19,038 1,653
Tgal
TOTAL YEARLY COSTS $633,230
RECOMMENDED SAVINGS* $58,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,257

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.7221: Lower temperature during the winter season and vice-versa $24,463 $480 $15,463
386,564
kWh
$9,000
-
kW-mo/yr
- - -
02 3.4116: Meter recycled water (to reduce sewer charges) $12,537 $1,380 - - - - $12,537
-
Tgal
03 2.8114: Change rate schedules or other changes in utility service $9,170 $2,549 - - $9,170 - -
04 2.7425: Clean or color roof to reduce solar load $4,060 $14,609 $2,250
56,249
kWh
$1,810
-
kW-mo/yr
- - -
05 2.4239: Eliminate or reduce compressed air usage $2,836 $2,100 $2,580
64,496
kWh
$256
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,427 $1,980 $1,539
38,466
kWh
$888
-
kW-mo/yr
- - -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $2,040 $616 $695
17,370
kWh
$553
-
kW-mo/yr
- $792
-
MMBtu
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,367 $2,549 $747
18,682
kWh
$620
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $58,900 $26,263 $23,274
581,827
kWh
$13,127
-
kW-mo/yr
$9,170 $792
-
MMBtu
$12,537
-
Tgal
TOTAL IMPLEMENTED $28,257 $5,009 $17,749
443,712
kWh
$10,508
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs