ITAC Assessment: LS2404
ITAC logo
ITAC Assessment: LS2404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Industrial Valves
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 257,240
ft2
Annual Production 4,000
units
Production Hrs. Annual 3,210
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,040 1,469,500
kWh
Electricity Demand $27,073 6,568
kW-mo/yr
TOTAL YEARLY COSTS $170,113
RECOMMENDED SAVINGS* $22,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,271

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $5,988 $275 $5,988
61,731
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,008 $75 $1,008
10,387
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,054 $135 $1,054
10,865
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,771 $3,080 $3,771
38,873
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,458 $11,138 $8,991
92,688
kWh
$1,467
-
kW-mo/yr
TOTAL RECOMMENDED $22,279 $14,703 $20,812
214,544
kWh
$1,467
-
kW-mo/yr
TOTAL IMPLEMENTED $21,271 $14,628 $19,804
204,157
kWh
$1,467
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs