ITAC Assessment: MI0387
ITAC logo
ITAC Assessment: MI0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Valve Manufacturing
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $1
M
to 5
M
# of Employees 106
Plant Area 38,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,712 987,120
kWh
Electricity Demand $36,128 3,217
kW-mo/yr
Electricity Fees $16,104 -
Fuel Oil #2 $5,358 275
MMBtu
TOTAL YEARLY COSTS $101,302
RECOMMENDED SAVINGS* $35,865 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7229: Air condition only space necessary $12,419 $16,940 $9,196
208,998
kWh
$3,223
-
kW-mo/yr
02 2.4224: Upgrade controls on compressors $4,326 $10,320 $3,169
72,024
kWh
$1,157
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $3,862 $9,016 $2,222
50,504
kWh
$1,640
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,993 $4,308 $1,791
40,706
kWh
$1,202
-
kW-mo/yr
05 2.7425: Clean or color roof to reduce solar load $2,971 $11,975 $1,455
33,068
kWh
$1,516
-
kW-mo/yr
06 2.4239: Eliminate or reduce compressed air usage $1,824 $120 $1,352
30,724
kWh
$472
-
kW-mo/yr
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,595 $1,980 $1,179
26,784
kWh
$416
-
kW-mo/yr
08 2.4112: Install soft-start to eliminate nuisance trips $3,060 $2,791 $1,544
35,097
kWh
$1,516
-
kW-mo/yr
09 2.7135: Install occupancy sensors $1,412 $780 $1,412
32,094
kWh
-
10 2.4323: Use optimum size and capacity equipment $1,403 $4,900 $1,044
23,716
kWh
$359
-
kW-mo/yr
TOTAL RECOMMENDED $35,865 $63,130 $24,364
553,715
kWh
$11,501
-
kW-mo/yr
TOTAL IMPLEMENTED $21,646 $29,028 $15,974
363,022
kWh
$5,672
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs