ITAC Assessment: SD0386
ITAC logo
ITAC Assessment: SD0386
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product High Purity Chemicals
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 170
Plant Area 85,000
ft2
Annual Production 72
Tgal
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $467,778 6,628,756
kWh
Electricity Demand $210,416 12,956
kW-mo/yr
Natural Gas $179,034 16,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,806 $10,192 $5,906
83,666
kWh
$1,900
-
kW-mo/yr
02 2.4133: Use most efficient type of electric motors $956 $8,800 $729
10,330
kWh
$227
-
kW-mo/yr
03 2.7134: Use photocell controls $3,792 $720 $1,064
15,071
kWh
$2,728
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $965 $3,928 $738
10,461
kWh
$227
-
kW-mo/yr
TOTAL RECOMMENDED $13,519 $23,640 $8,437
119,528
kWh
$5,082
-
kW-mo/yr
TOTAL IMPLEMENTED $956 $8,800 $729
10,330
kWh
$227
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs