ITAC Assessment: MI0384
ITAC logo
ITAC Assessment: MI0384
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product electronic parts for AIrcrafts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 128,000
ft2
Annual Production 941,402
pieces
Production Hrs. Annual 2,100
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,956 4,617,408
kWh
Electricity Demand $141,749 10,465
kW-mo/yr
Electricity Fees $23,464 -
TOTAL YEARLY COSTS $344,169
RECOMMENDED SAVINGS* $112,914 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $86,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7221: Lower temperature during the winter season and vice-versa $69,936 $480 $47,478
1,217,374
kWh
$22,458
-
kW-mo/yr
-
02 2.9112: Use solar heat to heat water $26,710 $12,200 $23,134
593,190
kWh
$3,576
-
kW-mo/yr
-
03 2.4224: Upgrade controls on compressors $4,404 $16,320 $2,941
75,411
kWh
$1,463
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,546 $3,927 $2,408
61,747
kWh
$1,138
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,610 $2,100 $1,745
44,738
kWh
$865
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,477 $8,668 $830
21,273
kWh
$1,647
-
kW-mo/yr
-
07 2.8123: Pay utility bills on time $1,659 - - - $1,659
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,572 $1,980 $1,085
27,818
kWh
$487
-
kW-mo/yr
-
TOTAL RECOMMENDED $112,914 $45,675 $79,621
2,041,551
kWh
$31,634
-
kW-mo/yr
$1,659
TOTAL IMPLEMENTED $86,204 $33,475 $56,487
1,448,361
kWh
$28,058
-
kW-mo/yr
$1,659
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs