ITAC Assessment: MI0383
ITAC logo
ITAC Assessment: MI0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Cosmetics
NAICS 325611: Soap and Other Detergent Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 50,000
ft2
Annual Production 5,500,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,188 716,045
kWh
Electricity Demand $25,365 2,268
kW-mo/yr
Electricity Fees $13,753 -
Waste Disposal Costs
Water Usage $13,072 3,554
Tgal
Water Disposal $15,977 2,843
Tgal
TOTAL YEARLY COSTS $102,355
RECOMMENDED SAVINGS* $27,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,846

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.9112: Use solar heat to heat water $10,293 $12,280 $8,436
175,756
kWh
$1,857
-
kW-mo/yr
-
02 2.7221: Lower temperature during the winter season and vice-versa $9,548 $480 $7,289
151,855
kWh
$2,259
-
kW-mo/yr
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $2,976 $1,428 $1,388
28,911
kWh
$1,588
-
kW-mo/yr
-
04 3.4116: Meter recycled water (to reduce sewer charges) $2,698 $1,306 - - $2,698
-
Tgal
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,327 $2,436 $902
18,792
kWh
$425
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $552 $882 $552
11,491
kWh
- -
TOTAL RECOMMENDED $27,394 $18,812 $18,567
386,805
kWh
$6,129
-
kW-mo/yr
$2,698
-
Tgal
TOTAL IMPLEMENTED $17,846 $18,332 $11,278
234,950
kWh
$3,870
-
kW-mo/yr
$2,698
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs