ITAC Assessment: MI0382
ITAC logo
ITAC Assessment: MI0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Aerospace Engines
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 35,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,063 2,052,720
kWh
Electricity Demand $70,399 5,936
kW-mo/yr
Electricity Fees $16,357 -
Waste Disposal Costs
Water Usage $9,081 1,460
Tgal
Water Disposal $10,439 1,460
Tgal
TOTAL YEARLY COSTS $201,339
RECOMMENDED SAVINGS* $31,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,242

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $9,223 $3,645 $6,815
148,159
kWh
$2,408
-
kW-mo/yr
-
02 2.9112: Use solar heat to heat water $7,209 $8,409 $4,647
101,018
kWh
$2,562
-
kW-mo/yr
-
03 2.4112: Install soft-start to eliminate nuisance trips $5,430 $2,740 $1,872
40,697
kWh
$3,558
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $4,045 $1,796 $2,989
64,976
kWh
$1,056
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,278 $3,204 $1,519
33,022
kWh
$759
-
kW-mo/yr
-
06 3.4116: Meter recycled water (to reduce sewer charges) $2,088 $1,306 - - $2,088
-
Tgal
07 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $964 $1,884 $964
20,966
kWh
- -
TOTAL RECOMMENDED $31,237 $22,984 $18,806
408,838
kWh
$10,343
-
kW-mo/yr
$2,088
-
Tgal
TOTAL IMPLEMENTED $3,242 $5,088 $2,483
53,988
kWh
$759
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs