ITAC Assessment: MI0381
ITAC logo
ITAC Assessment: MI0381
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Engines for Aerospace
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 261
Plant Area 300,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 6,750
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $517,267 14,669,166
kWh
Electricity Demand $344,615 64,387
kW-mo/yr
Electricity Fees $111,301 -
Natural Gas $116,450 40,155
MMBtu
TOTAL YEARLY COSTS $1,089,633
RECOMMENDED SAVINGS* $53,347 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,578

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $23,304 $57,960 $17,262
493,200
kWh
$6,042
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,914 $860 $9,351
267,158
kWh
$3,683
-
kW-mo/yr
- $(-1,120.0)
03 2.2414: Use waste heat from hot flue gases to preheat $7,145 $2,400 - - $7,145
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,241 $555 $3,048
87,090
kWh
$1,193
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,735 $980 $2,208
63,079
kWh
$1,647
-
kW-mo/yr
- $(-1,120.0)
06 2.1232: Keep boiler tubes clean $2,320 $3,500 - - $2,320
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,688 $4,905 $1,131
32,326
kWh
$557
-
kW-mo/yr
- -
TOTAL RECOMMENDED $53,347 $71,160 $33,000
942,853
kWh
$13,122
-
kW-mo/yr
$9,465
-
MMBtu
$(-2,240.0)
TOTAL IMPLEMENTED $20,578 $7,300 $15,738
449,653
kWh
$7,080
-
kW-mo/yr
- $(-2,240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs