Assessment Year | 2021 |
---|---|
Principal Product | Engines for Aerospace |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 261 |
Plant Area |
300,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 6,750
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $517,267 | 14,669,166 |
kWh
|
$0.035 |
Electricity Demand | $344,615 | 64,387 |
kW-mo/yr
|
$5.35 |
Electricity Fees | $111,301 | - |
|
- |
Natural Gas | $116,450 | 40,155 |
MMBtu
|
$2.90 |
TOTAL YEARLY COSTS | $1,089,633 | |||
RECOMMENDED SAVINGS* | $53,347 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,578 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $23,304 | $57,960 |
$17,262
493,200
kWh
|
$6,042
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,914 | $860 |
$9,351
267,158
kWh
|
$3,683
-
kW-mo/yr
|
- | $(-1,120.0) | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $7,145 | $2,400 | - | - |
$7,145
-
MMBtu
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,241 | $555 |
$3,048
87,090
kWh
|
$1,193
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,735 | $980 |
$2,208
63,079
kWh
|
$1,647
-
kW-mo/yr
|
- | $(-1,120.0) | |
06 | 2.1232: Keep boiler tubes clean | $2,320 | $3,500 | - | - |
$2,320
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,688 | $4,905 |
$1,131
32,326
kWh
|
$557
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $53,347 | $71,160 |
$33,000
942,853
kWh
|
$13,122
-
kW-mo/yr
|
$9,465
-
MMBtu
|
$(-2,240.0) | ||
TOTAL IMPLEMENTED | $20,578 | $7,300 |
$15,738
449,653
kWh
|
$7,080
-
kW-mo/yr
|
- | $(-2,240.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs