ITAC Assessment: MI0369
ITAC logo
ITAC Assessment: MI0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Adhesives and Sealants
NAICS 325520: Adhesive Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 100,000
ft2
Annual Production 1,500
Tgal
Production Hrs. Annual 4,290
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,729 879,648
kWh
Electricity Demand $46,101 7,092
kW-mo/yr
Electricity Fees $3,938 -
TOTAL YEARLY COSTS $122,768
RECOMMENDED SAVINGS* $25,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7221: Lower temperature during the winter season and vice-versa $11,259 $580 $10,167
122,490
kWh
$1,092
-
kW-mo/yr
-
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $6,954 $7,492 $6,954
83,786
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,267 $1,980 $2,708
32,621
kWh
$559
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,265 $7,389 $2,712
32,669
kWh
$553
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $551 $280 $551
6,639
kWh
- -
06 4.821: Pay bills on time to avoid late fees $438 - - - $438
TOTAL RECOMMENDED $25,734 $17,721 $23,092
278,205
kWh
$2,204
-
kW-mo/yr
$438
TOTAL IMPLEMENTED $21,480 $10,052 $19,829
238,897
kWh
$1,651
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs