Assessment Year | 2020 |
---|---|
Principal Product | Adhesives and Sealants |
NAICS | 325520: Adhesive Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
100,000
ft2
|
Annual Production | 1,500
Tgal
|
Production Hrs. Annual | 4,290
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $72,729 | 879,648 |
kWh
|
$0.083 |
Electricity Demand | $46,101 | 7,092 |
kW-mo/yr
|
$6.50 |
Electricity Fees | $3,938 | - |
|
- |
TOTAL YEARLY COSTS | $122,768 | |||
RECOMMENDED SAVINGS* | $25,734 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,480 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $11,259 | $580 |
$10,167
122,490
kWh
|
$1,092
-
kW-mo/yr
|
- | |
02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $6,954 | $7,492 |
$6,954
83,786
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,267 | $1,980 |
$2,708
32,621
kWh
|
$559
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,265 | $7,389 |
$2,712
32,669
kWh
|
$553
-
kW-mo/yr
|
- | |
05 | 2.4226: Use / purchase optimum sized compressor | $551 | $280 |
$551
6,639
kWh
|
- | - | |
06 | 4.821: Pay bills on time to avoid late fees | $438 | - | - | - | $438 | |
TOTAL RECOMMENDED | $25,734 | $17,721 |
$23,092
278,205
kWh
|
$2,204
-
kW-mo/yr
|
$438 | ||
TOTAL IMPLEMENTED | $21,480 | $10,052 |
$19,829
238,897
kWh
|
$1,651
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs