ITAC Assessment: MI0364
ITAC logo
ITAC Assessment: MI0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Nutrition Products
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $50
M
to 100
M
# of Employees 65
Plant Area 74,000
ft2
Annual Production 4,500,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,536 2,412,480
kWh
Electricity Demand $79,097 5,928
kW-mo/yr
Electricity Fees $50,098 -
Natural Gas $22,434 1,422
MMBtu
TOTAL YEARLY COSTS $259,165
RECOMMENDED SAVINGS* $101,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,484

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $38,687 $109,552 $27,492
610,939
kWh
$11,195
-
kW-mo/yr
02 2.7425: Clean or color roof to reduce solar load $21,750 $35,446 $6,512
144,711
kWh
$15,238
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $19,252 $23,997 $11,193
248,732
kWh
$8,059
-
kW-mo/yr
04 2.6218: Turn off equipment when not in use $10,631 $3,600 $10,631
236,255
kWh
-
05 2.7229: Air condition only space necessary $5,164 $16,940 $3,670
81,549
kWh
$1,494
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,784 $7,500 $2,410
53,557
kWh
$1,374
-
kW-mo/yr
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,899 $3,316 $1,352
30,035
kWh
$547
-
kW-mo/yr
TOTAL RECOMMENDED $101,167 $200,351 $63,260
1,405,778
kWh
$37,907
-
kW-mo/yr
TOTAL IMPLEMENTED $95,484 $189,535 $59,498
1,322,186
kWh
$35,986
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs