ITAC Assessment: MI0362
ITAC logo
ITAC Assessment: MI0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Stamped Metals
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 100,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,878 4,813,680
kWh
Electricity Demand $181,294 13,709
kW-mo/yr
Electricity Fees $74,999 -
Natural Gas $1,004 241
MMBtu
TOTAL YEARLY COSTS $470,175
RECOMMENDED SAVINGS* $141,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,319

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8114: Change rate schedules or other changes in utility service $67,585 $640 - - $67,585
02 2.7232: Replace existing hvac unit with high efficiency model $49,454 $216,900 $35,000
795,457
kWh
$14,454
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $11,441 $3,600 $11,441
260,024
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,814 $1,980 $2,452
55,726
kWh
$1,362
-
kW-mo/yr
-
05 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,811 $1,120 $1,780
40,448
kWh
$1,031
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,851 $160 $1,190
27,056
kWh
$661
-
kW-mo/yr
-
07 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,481 $185 $952
21,633
kWh
$529
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $1,148 $1,126 $725
16,487
kWh
$423
-
kW-mo/yr
-
09 2.7492: Use proper thickness of insulation on building envelope $1,147 $1,090 $724
16,459
kWh
$423
-
kW-mo/yr
-
10 2.1131: Repair faulty insulation in furnaces, boilers, etc $288 $187 $182
4,128
kWh
$106
-
kW-mo/yr
-
TOTAL RECOMMENDED $141,020 $226,988 $54,446
1,237,418
kWh
$18,989
-
kW-mo/yr
$67,585
TOTAL IMPLEMENTED $19,319 $8,168 $16,476
374,457
kWh
$2,843
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings