ITAC Assessment: MI0360
ITAC logo
ITAC Assessment: MI0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Turnovers & empanadillas
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 30,000
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $471,566 2,462,518
kWh
Electricity Demand $46,702 4,852
kW-mo/yr
Electricity Fees $5,242 -
LPG $6,558 1,118
MMBtu
Fuel Oil #2 $229,162 10,497
MMBtu
TOTAL YEARLY COSTS $759,230
RECOMMENDED SAVINGS* $100,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,879

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings
01 2.9112: Use solar heat to heat water $36,147 $40,234 $36,147
189,249
kWh
- - -
02 2.8223: Add air shields to trucks to increase fuel mileage $34,382 $15,720 - - - $34,382
-
MMBtu
03 2.6218: Turn off equipment when not in use $9,735 $3,600 $9,735
50,970
kWh
- - -
04 2.3212: Optimize plant power factor $5,613 $13,630 - - $5,613 -
05 2.4133: Use most efficient type of electric motors $4,707 $3,634 $4,024
21,068
kWh
$683
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,330 $3,023 $3,993
20,904
kWh
$337
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,445 $1,980 $2,243
11,745
kWh
$202
-
kW-mo/yr
- -
08 2.7496: Install partitions to reduce size of conditioned space $1,675 $3,764 $1,569
8,216
kWh
$106
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $751 $211 $751
3,932
kWh
- - -
10 2.8114: Change rate schedules or other changes in utility service $684 $100 - - $684 -
11 2.7444: Close holes and openings in building such as broken windows $476 $868 $447
2,339
kWh
$29
-
kW-mo/yr
- -
TOTAL RECOMMENDED $100,945 $86,764 $58,909
308,423
kWh
$1,357
-
kW-mo/yr
$6,297 $34,382
-
MMBtu
TOTAL IMPLEMENTED $65,879 $70,944 $58,909
308,423
kWh
$1,357
-
kW-mo/yr
$5,613 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings