ITAC Assessment: MI0353
ITAC logo
ITAC Assessment: MI0353
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Maritime Systems
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 152,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 2,574
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,368 2,533,494
kWh
Electricity Demand $67,845 6,318
kW-mo/yr
Electricity Fees $44,504 -
TOTAL YEARLY COSTS $235,717
RECOMMENDED SAVINGS* $31,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,364

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.2628: Utilize a less expensive cooling method $15,478 $75,224 $8,626
176,039
kWh
$2,652
-
kW-mo/yr
$4,200
02 2.6218: Turn off equipment when not in use $5,753 $3,600 $5,753
117,416
kWh
- -
03 2.7221: Lower temperature during the winter season and vice-versa $5,611 $480 $4,312
88,003
kWh
$1,299
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,503 $3,260 $1,386
28,281
kWh
$1,117
-
kW-mo/yr
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,921 $3,848 $1,459
29,783
kWh
$462
-
kW-mo/yr
-
06 2.7444: Close holes and openings in building such as broken windows $313 $128 $238
4,848
kWh
$75
-
kW-mo/yr
-
TOTAL RECOMMENDED $31,579 $86,540 $21,774
444,370
kWh
$5,605
-
kW-mo/yr
$4,200
TOTAL IMPLEMENTED $11,364 $4,080 $10,065
205,419
kWh
$1,299
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs