ITAC Assessment: MI0349
ITAC logo
ITAC Assessment: MI0349
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Cutting Tools
NAICS 333515: Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 52,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 4,992
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,334 4,231,340
kWh
Electricity Demand $94,595 9,313
kW-mo/yr
Electricity Fees $59,989 -
TOTAL YEARLY COSTS $439,918
RECOMMENDED SAVINGS* $80,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,164

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.2628: Utilize a less expensive cooling method $30,080 $110,000 $21,629
322,817
kWh
$5,251
-
kW-mo/yr
$3,200
02 2.6218: Turn off equipment when not in use $11,314 $3,100 $11,314
168,871
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,623 $13,592 $7,053
105,276
kWh
$2,570
-
kW-mo/yr
-
04 2.7423: Reduce heat gain by window tinting $9,207 $13,256 $9,207
137,418
kWh
- -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,565 $9,500 $5,544
82,742
kWh
$2,021
-
kW-mo/yr
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $4,966 $2,644 $2,874
42,893
kWh
$2,092
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $3,414 $972 $1,819
27,145
kWh
$1,595
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $3,282 $200 $2,713
40,495
kWh
$569
-
kW-mo/yr
-
09 2.7134: Use photocell controls $1,282 $622 $619
9,233
kWh
$663
-
kW-mo/yr
-
TOTAL RECOMMENDED $80,733 $153,886 $62,772
936,890
kWh
$14,761
-
kW-mo/yr
$3,200
TOTAL IMPLEMENTED $38,164 $30,430 $29,223
436,160
kWh
$8,941
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs