ITAC Assessment: MI0344
ITAC logo
ITAC Assessment: MI0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Cleaning Products
NAICS 325612: Polish and Other Sanitation Good Manufacturing
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area 100,000
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,897 686,187
kWh
Electricity Demand $33,837 3,135
kW-mo/yr
Electricity Fees $6,646 -
TOTAL YEARLY COSTS $149,380
RECOMMENDED SAVINGS* $99,697 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,264

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 3.4159: Replace treated water with well / surface water $55,478 $62,800 - - - $55,478
02 2.3212: Optimize plant power factor $12,638 $18,415 - - $12,638 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,405 $6,666 $6,041
37,993
kWh
$2,364
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,313 $15,147 $6,305
39,656
kWh
$2,008
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $7,317 $9,570 $5,255
33,050
kWh
$2,062
-
kW-mo/yr
- -
06 2.7134: Use photocell controls $3,042 $2,219 $1,942
12,211
kWh
$1,100
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,495 $2,030 $1,794
11,278
kWh
$701
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $1,536 $846 $1,104
6,943
kWh
$432
-
kW-mo/yr
- -
09 2.7447: Install vinyl strip / high speed / air curtain doors $474 $760 $344
2,162
kWh
$130
-
kW-mo/yr
- -
TOTAL RECOMMENDED $99,697 $118,453 $22,785
143,293
kWh
$8,795
-
kW-mo/yr
$12,638 $55,478
TOTAL IMPLEMENTED $24,264 $27,668 $17,530
110,243
kWh
$6,734
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs