Assessment Year | 2018 |
---|---|
Principal Product | Healthcare |
NAICS | 622110: General Medical and Surgical Hospitals |
SIC | 8062: General Medical and Surgical Hospitals |
Sales Range | $10 M to 50M |
# of Employees | 457 |
Plant Area |
364,103
ft2
|
Annual Production | 20,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,537,374 | 9,134,928 |
kWh
|
$0.17 |
Electricity Demand | $128,190 | 15,296 |
kW-mo/yr
|
$8.38 |
Electricity Fees | $10,993 | - |
|
- |
Fuel Oil #2 | $53,716 | 3,504 |
MMBtu
|
$15.33 |
TOTAL YEARLY COSTS | $1,730,273 | |||
RECOMMENDED SAVINGS* | $845,496 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $145,140 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $493,014 | $3,929,170 |
$1,399,126
8,328,132
kWh
|
$130,266
-
kW-mo/yr
|
- |
$(-1,090,094.0)
-
MMBtu
|
$53,716
-
MMBtu
|
|
02 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $174,309 | $491,100 |
$163,129
971,007
kWh
|
$11,180
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $68,630 | $44,639 |
$64,087
381,471
kWh
|
$4,543
-
kW-mo/yr
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $64,892 | $24,640 |
$60,727
361,469
kWh
|
$4,165
-
kW-mo/yr
|
- | - | - | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $17,112 | $2,475 |
$15,914
94,725
kWh
|
$1,198
-
kW-mo/yr
|
- | - | - | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $11,618 | $12,938 |
$10,872
64,712
kWh
|
$746
-
kW-mo/yr
|
- | - | - | |
07 | 2.3212: Optimize plant power factor | $6,724 | $17,025 | - | - | $6,724 | - | - | |
08 | 2.4322: Use or replace with energy efficient substitutes | $5,909 | $17,222 |
$5,373
31,980
kWh
|
$536
-
kW-mo/yr
|
- | - | - | |
09 | 2.7221: Lower temperature during the winter season and vice-versa | $3,288 | $80 |
$3,078
18,323
kWh
|
$210
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $845,496 | $4,539,289 |
$1,722,306
10,251,819
kWh
|
$152,844
-
kW-mo/yr
|
$6,724 |
$(-1,090,094.0)
-
MMBtu
|
$53,716
-
MMBtu
|
||
TOTAL IMPLEMENTED | $145,140 | $82,217 |
$135,686
807,652
kWh
|
$9,454
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs