ITAC Assessment: KU0253
ITAC logo
ITAC Assessment: KU0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PATTERNS FOR HOME SEWING
NAICS
n/a
SIC 2741: Miscellaneous Publishing
Sales Range $50
M
to 100
M
# of Employees 320
Plant Area
n/a
Annual Production 50,000,000
pieces
Production Hrs. Annual 4,118
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,166 3,400,059
kWh
Natural Gas $27,190 10,325
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,725

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $3,786 $790 $3,786
65,651
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $226 - - $376
-
MMBtu
$(-150.0)
03 2.2621: Modify refrigeration system to operate at a lower pressure $6,185 $12,000 $6,185
107,268
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,211 - $3,211
55,686
kWh
- -
05 2.6121: Reduce hot water temperature to the minimum required $288 - $101
1,758
kWh
$187
-
MMBtu
-
TOTAL RECOMMENDED $13,696 $12,790 $13,283
230,363
kWh
$563
-
MMBtu
$(-150.0)
TOTAL IMPLEMENTED $3,725 - $3,312
57,444
kWh
$563
-
MMBtu
$(-150.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs