ITAC Assessment: MI0335
ITAC logo
ITAC Assessment: MI0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Aluminum Accessories
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 74,000
ft2
Annual Production 8,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,692 468,910
kWh
Electricity Demand $12,395 1,254
kW-mo/yr
Electricity Fees $6,496 -
Natural Gas $28,079 2,183
MMBtu
Fuel Oil #2 $14,490 876
MMBtu
Waste Disposal Costs
Water Usage $1,438 322
Tgal
TOTAL YEARLY COSTS $100,589
RECOMMENDED SAVINGS* $20,233 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $4,545 $3,280 $4,545
56,818
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,167 $8,063 $2,714
33,930
kWh
$1,453
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,894 $2,030 $2,012
25,147
kWh
$882
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,798 $7,385 - - $2,798
-
MMBtu
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,932 $7,536 $914
11,425
kWh
$1,018
-
kW-mo/yr
-
06 4.431: Train operators for maximum operating efficiency $1,505 $480 - - $1,505
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,235 $2,520 - - $1,235
-
MMBtu
08 2.2437: Recover waste heat from equipment $1,157 $5,370 - - $1,157
-
MMBtu
TOTAL RECOMMENDED $20,233 $36,664 $10,185
127,320
kWh
$3,353
-
kW-mo/yr
$6,695
-
MMBtu
TOTAL IMPLEMENTED $20,233 $36,664 $10,185
127,320
kWh
$3,353
-
kW-mo/yr
$6,695
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs