| Assessment Year | 2018 |
|---|---|
| Principal Product | Aluminum Accessories |
| NAICS | 332313: Plate Work Manufacturing |
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 110 |
| Plant Area |
74,000
ft2
|
| Annual Production | 8,000
pieces
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $37,692 | 468,910 |
kWh
|
$0.080 | |
| Electricity Demand | $12,395 | 1,254 |
kW-mo/yr
|
$9.88 | |
| Electricity Fees | $6,496 | - |
|
- | |
| Natural Gas | $28,079 | 2,183 |
MMBtu
|
$12.86 | |
| Fuel Oil #2 | $14,490 | 876 |
MMBtu
|
$16.55 | |
| Waste Disposal Costs | |||||
| Water Usage | $1,438 | 322 |
Tgal
|
$4.47 | |
| TOTAL YEARLY COSTS | $100,589 | ||||
| RECOMMENDED SAVINGS* | $20,233 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $20,233 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $4,545 | $3,280 |
$4,545
56,818
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,167 | $8,063 |
$2,714
33,930
kWh
|
$1,453
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,894 | $2,030 |
$2,012
25,147
kWh
|
$882
-
kW-mo/yr
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,798 | $7,385 | - | - |
$2,798
-
MMBtu
|
|
| 05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,932 | $7,536 |
$914
11,425
kWh
|
$1,018
-
kW-mo/yr
|
- | |
| 06 | 4.431: Train operators for maximum operating efficiency | $1,505 | $480 | - | - |
$1,505
-
MMBtu
|
|
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,235 | $2,520 | - | - |
$1,235
-
MMBtu
|
|
| 08 | 2.2437: Recover waste heat from equipment | $1,157 | $5,370 | - | - |
$1,157
-
MMBtu
|
|
| TOTAL RECOMMENDED | $20,233 | $36,664 |
$10,185
127,320
kWh
|
$3,353
-
kW-mo/yr
|
$6,695
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $20,233 | $36,664 |
$10,185
127,320
kWh
|
$3,353
-
kW-mo/yr
|
$6,695
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs