ITAC Assessment: MI0304
ITAC logo
ITAC Assessment: MI0304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Power Turbines
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $100
M
to 500
M
# of Employees 439
Plant Area 150,030
ft2
Annual Production 21,018
units
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,103,566 18,381,934
kWh
Electricity Demand $400,942 41,927
kW-mo/yr
Electricity Fees $45,627 -
TOTAL YEARLY COSTS $1,550,135
RECOMMENDED SAVINGS* $153,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $120,784

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $48,914 $119,809 $38,298
638,296
kWh
$10,616
-
kW-mo/yr
-
02 2.7425: Clean or color roof to reduce solar load $30,447 $53,372 $21,175
352,927
kWh
$9,272
-
kW-mo/yr
-
03 2.2628: Utilize a less expensive cooling method $16,987 $25,335 $9,316
155,272
kWh
$2,031
-
kW-mo/yr
$5,640
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,015 $1,700 $7,470
124,489
kWh
$4,545
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,470 $43,770 $9,411
156,859
kWh
$2,059
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,388 $8,320 $9,343
155,716
kWh
$2,045
-
kW-mo/yr
-
07 2.4323: Use optimum size and capacity equipment $6,723 $4,691 $6,369
106,148
kWh
$354
-
kW-mo/yr
-
08 2.4239: Eliminate or reduce compressed air usage $4,720 $2,320 $3,917
65,276
kWh
$803
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,968 $7,680 $2,968
49,463
kWh
- -
10 2.7447: Install vinyl strip / high speed / air curtain doors $2,936 $2,430 $2,042
34,030
kWh
$894
-
kW-mo/yr
-
11 2.7135: Install occupancy sensors $1,803 $662 $1,803
30,052
kWh
- -
12 2.4112: Install soft-start to eliminate nuisance trips $1,779 $3,350 $954
15,897
kWh
$825
-
kW-mo/yr
-
13 2.7134: Use photocell controls $1,570 $1,120 $1,570
26,166
kWh
- -
TOTAL RECOMMENDED $153,720 $274,559 $114,636
1,910,591
kWh
$33,444
-
kW-mo/yr
$5,640
TOTAL IMPLEMENTED $120,784 $238,663 $91,422
1,523,699
kWh
$29,362
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs