ITAC Assessment: MI0287
ITAC logo
ITAC Assessment: MI0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bottled Juice
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 40,000
ft2
Annual Production 3,380
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,698 1,512,452
kWh
Electricity Demand $48,492 4,413
kW-mo/yr
Electricity Fees $23,744 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,937

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $15,717 $1,400 - - $15,717
02 2.7425: Clean or color roof to reduce solar load $10,892 $10,800 $8,475
159,908
kWh
$2,417
-
kW-mo/yr
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $6,014 $4,218 $4,684
90,215
kWh
$1,330
-
kW-mo/yr
-
04 2.7496: Install partitions to reduce size of conditioned space $5,439 $160 $5,439
102,630
kWh
- -
05 2.2515: Use optimum thickness insulation $2,395 $8,535 $1,091
20,580
kWh
$1,304
-
kW-mo/yr
-
06 2.3132: Recharge batteries on during off-peak demand periods $1,450 $3,140 - $1,450
-
kW-mo/yr
-
07 2.8114: Change rate schedules or other changes in utility service $1,047 $280 - - $1,047
08 2.7496: Install partitions to reduce size of conditioned space $907 $336 $907
17,105
kWh
- -
09 2.7135: Install occupancy sensors $397 $709 $397
7,492
kWh
- -
10 2.7134: Use photocell controls $184 $600 $184
3,462
kWh
- -
TOTAL RECOMMENDED $44,442 $30,178 $21,177
401,392
kWh
$6,501
-
kW-mo/yr
$16,764
TOTAL IMPLEMENTED $18,937 $19,467 $13,740
261,077
kWh
$5,197
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs