Assessment Year | 2015 |
---|---|
Principal Product | Test Strips |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
75,000
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $242,899 | 5,049,154 |
kWh
|
$0.048 |
Electricity Demand | $116,129 | 10,024 |
kW-mo/yr
|
$11.59 |
Electricity Fees | $65,206 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,178 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,965 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $7,699 | $1,400 |
$5,034
104,872
kWh
|
$2,665
-
kW-mo/yr
|
- | |
02 | 2.8114: Change rate schedules or other changes in utility service | $7,149 | $2,100 | - | - | $7,149 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,428 | $1,660 |
$4,829
100,597
kWh
|
$1,599
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,213 | $40 |
$2,414
50,300
kWh
|
$799
-
kW-mo/yr
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,213 | $4,750 |
$912
19,003
kWh
|
$301
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $1,053 | $332 |
$1,053
21,945
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $797 | $3,520 |
$797
16,600
kWh
|
- | - | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $393 | $220 |
$295
6,128
kWh
|
$98
-
kW-mo/yr
|
- | |
09 | 2.4239: Eliminate or reduce compressed air usage | $233 | $375 |
$175
3,646
kWh
|
$58
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $28,178 | $14,397 |
$15,509
323,091
kWh
|
$5,520
-
kW-mo/yr
|
$7,149 | ||
TOTAL IMPLEMENTED | $24,965 | $14,357 |
$13,095
272,791
kWh
|
$4,721
-
kW-mo/yr
|
$7,149 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs