ITAC Assessment: MI0273
ITAC logo
ITAC Assessment: MI0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Newspapers
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $50
M
to 100
M
# of Employees 470
Plant Area 130,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $524,366 14,238,000
kWh
Electricity Demand $482,465 38,461
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,563

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.7425: Clean or color roof to reduce solar load $36,507 $57,817 $18,895
510,668
kWh
$17,612
-
kW-mo/yr
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $8,849 $480 $6,039
163,217
kWh
$2,810
-
kW-mo/yr
- -
03 3.4151: Minimize water usage $8,287 $16,600 - - $8,287
-
Tgal
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,969 $1,660 $4,548
122,914
kWh
$2,421
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $6,933 $912 $6,933
187,387
kWh
- - -
06 2.7141: Lower light fixtures in high ceiling areas $6,562 $16,470 $4,480
121,081
kWh
$2,082
-
kW-mo/yr
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $6,447 $3,660 $4,402
118,985
kWh
$2,045
-
kW-mo/yr
- -
08 2.4239: Eliminate or reduce compressed air usage $6,157 $11,750 $4,200
113,519
kWh
$1,957
-
kW-mo/yr
- -
09 2.3132: Recharge batteries on during off-peak demand periods $5,843 $6,280 - $3,751
-
kW-mo/yr
- $2,092
10 2.4231: Reduce the pressure of compressed air to the minimum required $4,759 $80 $2,589
69,965
kWh
$2,170
-
kW-mo/yr
- -
11 2.7134: Use photocell controls $3,476 $1,080 $3,476
93,694
kWh
- - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $130 $375 $89
2,400
kWh
$41
-
kW-mo/yr
- -
TOTAL RECOMMENDED $100,919 $117,164 $55,651
1,503,830
kWh
$34,889
-
kW-mo/yr
$8,287
-
Tgal
$2,092
TOTAL IMPLEMENTED $49,563 $26,277 $32,276
872,081
kWh
$15,195
-
kW-mo/yr
- $2,092
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs