Assessment Year | 2015 |
---|---|
Principal Product | Clinical Laboratory Instruments |
NAICS | 333249: Other Industrial Machinery Manufacturing |
SIC | 3821: Laboratory Apparatus and Furniture |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
80,000
ft2
|
Annual Production | 85,000,000
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $285,841 | 5,694,920 |
kWh
|
$0.050 |
Electricity Demand | $104,154 | 7,978 |
kW-mo/yr
|
$13.06 |
Electricity Fees | $73,033 | - |
|
- |
Natural Gas | $91,783 | 8,271 |
MMBtu
|
$11.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $136,689 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $75,898 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3192: Use fossil fuel powered generator during peak demand periods | $49,371 | $1,400 | - | - | $49,371 | - | - | |
02 | 2.7425: Clean or color roof to reduce solar load | $29,534 | $20,088 |
$17,158
343,159
kWh
|
$12,376
-
kW-mo/yr
|
- | - | - | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $19,500 | $80 |
$14,330
286,594
kWh
|
$5,170
-
kW-mo/yr
|
- | - | - | |
04 | 2.6218: Turn off equipment when not in use | $12,676 | $3,600 |
$12,676
253,510
kWh
|
- | - | - | - | |
05 | 2.7496: Install partitions to reduce size of conditioned space | $5,181 | $4,080 |
$3,771
75,420
kWh
|
$1,410
-
kW-mo/yr
|
- | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $3,773 | $2,040 |
$1,710
34,204
kWh
|
$2,063
-
kW-mo/yr
|
- | - | - | |
07 | 2.2515: Use optimum thickness insulation | $3,506 | $1,140 | - | - | - |
$3,506
-
MMBtu
|
- | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,926 | $7,869 |
$1,359
27,181
kWh
|
$1,567
-
kW-mo/yr
|
- | - | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,351 | $3,960 | - | - | - |
$2,351
-
MMBtu
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,546 | $5,294 |
$867
17,336
kWh
|
$679
-
kW-mo/yr
|
- | - | - | |
11 | 3.5313: Increase amount of waste recovered for resale | $1,475 | $560 | - | - | - | - |
$1,475
-
lb
|
|
12 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,467 | $1,660 |
$1,389
27,788
kWh
|
$78
-
kW-mo/yr
|
- | - | - | |
13 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,282 | $645 |
$922
18,464
kWh
|
$360
-
kW-mo/yr
|
- | - | - | |
14 | 2.7135: Install occupancy sensors | $1,131 | $1,220 |
$1,131
22,613
kWh
|
- | - | - | - | |
15 | 2.4231: Reduce the pressure of compressed air to the minimum required | $970 | $80 |
$631
12,615
kWh
|
$339
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $136,689 | $53,716 |
$55,944
1,118,884
kWh
|
$24,042
-
kW-mo/yr
|
$49,371 |
$5,857
-
MMBtu
|
$1,475
-
lb
|
||
TOTAL IMPLEMENTED | $75,898 | $41,851 |
$50,120
1,002,387
kWh
|
$22,272
-
kW-mo/yr
|
- |
$3,506
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs