ITAC Assessment: MI0270
ITAC logo
ITAC Assessment: MI0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Clinical Laboratory Instruments
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 80,000
ft2
Annual Production 85,000,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,841 5,694,920
kWh
Electricity Demand $104,154 7,978
kW-mo/yr
Electricity Fees $73,033 -
Natural Gas $91,783 8,271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,689 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,898

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $49,371 $1,400 - - $49,371 - -
02 2.7425: Clean or color roof to reduce solar load $29,534 $20,088 $17,158
343,159
kWh
$12,376
-
kW-mo/yr
- - -
03 2.7221: Lower temperature during the winter season and vice-versa $19,500 $80 $14,330
286,594
kWh
$5,170
-
kW-mo/yr
- - -
04 2.6218: Turn off equipment when not in use $12,676 $3,600 $12,676
253,510
kWh
- - - -
05 2.7496: Install partitions to reduce size of conditioned space $5,181 $4,080 $3,771
75,420
kWh
$1,410
-
kW-mo/yr
- - -
06 2.7111: Reduce illumination to minimum necessary levels $3,773 $2,040 $1,710
34,204
kWh
$2,063
-
kW-mo/yr
- - -
07 2.2515: Use optimum thickness insulation $3,506 $1,140 - - - $3,506
-
MMBtu
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $2,926 $7,869 $1,359
27,181
kWh
$1,567
-
kW-mo/yr
- - -
09 2.1233: Analyze flue gas for proper air/fuel ratio $2,351 $3,960 - - - $2,351
-
MMBtu
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,546 $5,294 $867
17,336
kWh
$679
-
kW-mo/yr
- - -
11 3.5313: Increase amount of waste recovered for resale $1,475 $560 - - - - $1,475
-
lb
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,467 $1,660 $1,389
27,788
kWh
$78
-
kW-mo/yr
- - -
13 2.7447: Install vinyl strip / high speed / air curtain doors $1,282 $645 $922
18,464
kWh
$360
-
kW-mo/yr
- - -
14 2.7135: Install occupancy sensors $1,131 $1,220 $1,131
22,613
kWh
- - - -
15 2.4231: Reduce the pressure of compressed air to the minimum required $970 $80 $631
12,615
kWh
$339
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $136,689 $53,716 $55,944
1,118,884
kWh
$24,042
-
kW-mo/yr
$49,371 $5,857
-
MMBtu
$1,475
-
lb
TOTAL IMPLEMENTED $75,898 $41,851 $50,120
1,002,387
kWh
$22,272
-
kW-mo/yr
- $3,506
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs