ITAC Assessment: MI0243
ITAC logo
ITAC Assessment: MI0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Aircraft and heavy repair services
NAICS 811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Main
SIC 7699: Repair Shops and Related Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 168
Plant Area 85,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 3,432
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,936 2,316,485
kWh
Electricity Demand $142,844 12,568
kW-mo/yr
Electricity Fees $65,697 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,067

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $24,158 $2,300 $18,405
368,102
kWh
$5,753
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $13,601 $80 $7,641
152,815
kWh
$5,960
-
kW-mo/yr
03 2.7425: Clean or color roof to reduce solar load $8,984 $19,999 $5,004
100,082
kWh
$3,980
-
kW-mo/yr
04 2.7447: Install vinyl strip / high speed / air curtain doors $7,171 $9,782 $3,999
79,976
kWh
$3,172
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,219 $1,660 $2,899
57,974
kWh
$2,320
-
kW-mo/yr
06 2.7111: Reduce illumination to minimum necessary levels $3,831 $440 $2,137
42,749
kWh
$1,694
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,047 $10,080 $1,558
31,158
kWh
$489
-
kW-mo/yr
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,653 $80 $142
2,859
kWh
$1,511
-
kW-mo/yr
09 2.6127: Maintain air filters by cleaning or replacement $1,638 $793 $910
18,200
kWh
$728
-
kW-mo/yr
10 2.7135: Install occupancy sensors $1,228 $417 $682
13,624
kWh
$546
-
kW-mo/yr
11 2.7142: Utilize higher efficiency lamps and/or ballasts $814 $2,255 $359
7,172
kWh
$455
-
kW-mo/yr
12 2.7496: Install partitions to reduce size of conditioned space $513 $1,128 $286
5,719
kWh
$227
-
kW-mo/yr
TOTAL RECOMMENDED $70,857 $49,014 $44,022
880,430
kWh
$26,835
-
kW-mo/yr
TOTAL IMPLEMENTED $56,067 $27,167 $35,360
707,204
kWh
$20,707
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs