Assessment Year | 2023 |
---|---|
Principal Product | bolts and fastners |
NAICS | 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
79,000
ft2
|
Annual Production | 540,000
units
|
Production Hrs. Annual | 4,550
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $145,780 | 1,733,880 |
kWh
|
$0.084 |
Electricity Demand | $156,758 | 10,995 |
kW-mo/yr
|
$14.26 |
Electricity Fees | $17,175 | - |
|
- |
TOTAL YEARLY COSTS | $319,713 | |||
RECOMMENDED SAVINGS* | $109,241 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $109,241 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $87,415 | $1,061,947 |
$83,347
992,227
kWh
|
$4,068
-
kW-mo/yr
|
- | |
02 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $9,740 | $208 |
$2,425
28,856
kWh
|
$7,315
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,109 | $5,233 |
$4,219
50,236
kWh
|
$1,890
-
kW-mo/yr
|
- | |
04 | 2.7261: Install timers and/or thermostats | $3,626 | $9,286 |
$2,505
29,816
kWh
|
$1,121
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,351 | $1,947 |
$1,663
19,790
kWh
|
$630
-
kW-mo/yr
|
$58 | |
TOTAL RECOMMENDED | $109,241 | $1,078,621 |
$94,159
1,120,925
kWh
|
$15,024
-
kW-mo/yr
|
$58 | ||
TOTAL IMPLEMENTED | $109,241 | $1,078,621 |
$94,159
1,120,925
kWh
|
$15,024
-
kW-mo/yr
|
$58 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs