ITAC Assessment: AS0548
ITAC logo
ITAC Assessment: AS0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product bolts and fastners
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 79,000
ft2
Annual Production 540,000
units
Production Hrs. Annual 4,550
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,780 1,733,880
kWh
Electricity Demand $156,758 10,995
kW-mo/yr
Electricity Fees $17,175 -
TOTAL YEARLY COSTS $319,713
RECOMMENDED SAVINGS* $109,241 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,241

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $87,415 $1,061,947 $83,347
992,227
kWh
$4,068
-
kW-mo/yr
-
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $9,740 $208 $2,425
28,856
kWh
$7,315
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,109 $5,233 $4,219
50,236
kWh
$1,890
-
kW-mo/yr
-
04 2.7261: Install timers and/or thermostats $3,626 $9,286 $2,505
29,816
kWh
$1,121
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,351 $1,947 $1,663
19,790
kWh
$630
-
kW-mo/yr
$58
TOTAL RECOMMENDED $109,241 $1,078,621 $94,159
1,120,925
kWh
$15,024
-
kW-mo/yr
$58
TOTAL IMPLEMENTED $109,241 $1,078,621 $94,159
1,120,925
kWh
$15,024
-
kW-mo/yr
$58
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs