Assessment Year | 1996 |
---|---|
Principal Product | heat transfer products |
NAICS |
n/a
|
SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
110,000
ft2
|
Annual Production | 5,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,299 | 2,869,578 |
kWh
|
$0.021 |
Electricity Demand | $42,004 | 7,536 |
kW-mo/yr
|
$5.57 |
Natural Gas | $72,124 | 18,020 |
MMBtu
|
$4.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,936 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,218 | $2,828 |
$1,051
50,996
kWh
|
$1,167
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $400 | $1,380 |
$321
15,533
kWh
|
$79
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,937 | $263 |
$1,221
59,203
kWh
|
$716
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,326 | $25 |
$710
34,291
kWh
|
$616
-
kW-mo/yr
|
- | - | |
05 | 2.8113: Purchase gas directly from a contract gas supplier | $4,200 | $4,200 | - | - | - | $4,200 | |
06 | 2.3212: Optimize plant power factor | $1,548 | $5,018 | - | - | - | $1,548 | |
07 | 3.3128: Utilize other methods to remove contaminants | $5,051 | $25 | - | - |
$5,051
-
lb
|
- | |
TOTAL RECOMMENDED | $16,680 | $13,739 |
$3,303
160,023
kWh
|
$2,578
-
kW-mo/yr
|
$5,051
-
lb
|
$5,748 | ||
TOTAL IMPLEMENTED | $8,936 | $6,686 |
$1,542
74,736
kWh
|
$795
-
kW-mo/yr
|
$5,051
-
lb
|
$1,548 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs