Assessment Year | 2008 |
---|---|
Principal Product | Shopping Carts & Wire Displays |
NAICS | 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 121 |
Plant Area |
55,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 6,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $386,943 | 3,636,789 |
kWh
|
$0.11 |
Electricity Demand | $96,000 | 24,000 |
kW-mo/yr
|
$4.00 |
Natural Gas | $149,614 | 20,495 |
MMBtu
|
$7.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $160,753 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,551 | $474 |
$1,425
17,813
kWh
|
$126
-
kW-mo/yr
|
- | - | - | |
02 | 2.7134: Use photocell controls | $3,786 | $991 |
$650
8,128
kWh
|
$274
-
kW-mo/yr
|
- | $2,490 | $372 | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,657 | $1,021 |
$1,522
19,030
kWh
|
$135
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,483 | $101 |
$3,459
43,235
kWh
|
$24
-
kW-mo/yr
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $75,203 | $20,001 | - | - |
$75,203
-
MMBtu
|
- | - | |
06 | 2.1221: Replace obsolete burners with more efficient ones | $15,215 | $7,501 | - | - |
$15,215
-
MMBtu
|
- | - | |
07 | 2.6121: Reduce hot water temperature to the minimum required | $43,004 | $11,201 | - | - |
$43,004
-
MMBtu
|
- | - | |
08 | 2.7231: Use radiant heater for spot heating | $16,854 | $27,001 | - | - |
$16,854
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $160,753 | $68,291 |
$7,056
88,206
kWh
|
$559
-
kW-mo/yr
|
$150,276
-
MMBtu
|
$2,490 | $372 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs