ITAC Assessment: HO0045
ITAC logo
ITAC Assessment: HO0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Heat Shrinkable PVC Labels
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 70,000
ft2
Annual Production 3,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,755 2,716,589
kWh
Natural Gas $98,873 24,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,410 $2,252 $2,410
25,498
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,086 $1,095 $1,086
11,430
kWh
-
03 2.4133: Use most efficient type of electric motors $743 $1,067 $743
7,913
kWh
-
04 2.1211: Move boiler to more efficient location $665 $1,997 - $665
-
MMBtu
TOTAL RECOMMENDED $4,904 $6,411 $4,239
44,841
kWh
$665
-
MMBtu
TOTAL IMPLEMENTED $2,410 $2,252 $2,410
25,498
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs