Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Cannabis
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 435,600
ft2
Annual Production 19,520
lb
Production Hrs. Annual 3,500
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,320 576,711
kWh
Electricity Demand $21,150 4,032
kW-mo/yr
Natural Gas $36,000 4,337
MMBtu
TOTAL YEARLY COSTS $142,470
RECOMMENDED SAVINGS* $44,916 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $32,016 $73,500 $31,575
210,499
kWh
$8,286
-
kW-mo/yr
$(-7,844.2)
-
MMBtu
02 2.7135: Install occupancy sensors $1,344 $270 $1,344
8,967
kWh
- -
03 2.2511: Insulate bare equipment $11,555 $51,920 - - $11,555
-
MMBtu
TOTAL RECOMMENDED $44,916 $125,690 $32,919
219,466
kWh
$8,286
-
kW-mo/yr
$3,711
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs