Assessment Year | 2013 |
---|---|
Principal Product | Machinery castings |
NAICS | 331524: Aluminum Foundries (except Die-Casting) |
SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
155,000
ft2
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $713,367 | 11,445,779 |
kWh
|
$0.062 |
Electricity Demand | $252,696 | 24,468 |
kW-mo/yr
|
$10.33 |
Electricity Fees | $25,415 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,204 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $65,334 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $29,537 | $3,900 |
$24,040
387,738
kWh
|
$5,497
-
kW-mo/yr
|
|
02 | 2.6218: Turn off equipment when not in use | $16,828 | $2,038 |
$10,260
165,485
kWh
|
$6,568
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,622 | $1,660 |
$9,935
160,236
kWh
|
$6,687
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,217 | $80 |
$3,737
60,269
kWh
|
$3,480
-
kW-mo/yr
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $6,639 | $4,000 |
$4,048
65,284
kWh
|
$2,591
-
kW-mo/yr
|
|
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,014 | $2,406 |
$1,934
31,198
kWh
|
$2,080
-
kW-mo/yr
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,414 | $1,190 |
$805
15,476
kWh
|
$609
-
kW-mo/yr
|
|
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $933 | $1,020 |
$561
9,048
kWh
|
$372
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $83,204 | $16,294 |
$55,320
894,734
kWh
|
$27,884
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $65,334 | $9,808 |
$45,601
737,983
kWh
|
$19,733
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs