ITAC Assessment: MI0234
ITAC logo
ITAC Assessment: MI0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Cosmetics & Skin Care Products Manufacturing
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 75,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,214 600,423
kWh
Electricity Demand $25,294 2,538
kW-mo/yr
Electricity Fees $9,722 -
Natural Gas $15,176 1,695
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,807 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,337

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $9,035 $2,600 $8,856
155,367
kWh
$179
-
kW-mo/yr
-
02 2.7221: Lower temperature during the winter season and vice-versa $8,388 $80 $6,932
121,629
kWh
$1,456
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,377 $1,660 $3,788
66,449
kWh
$3,589
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,115 $8,409 $1,760
30,879
kWh
$1,355
-
kW-mo/yr
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,067 $2,520 - - $2,067
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,103 $80 $625
10,968
kWh
$478
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $311 $600 $176
3,084
kWh
$135
-
kW-mo/yr
-
08 2.6127: Maintain air filters by cleaning or replacement $252 $447 $142
2,493
kWh
$110
-
kW-mo/yr
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $159 $380 $89
1,568
kWh
$70
-
kW-mo/yr
-
TOTAL RECOMMENDED $31,807 $16,776 $22,368
392,437
kWh
$7,372
-
kW-mo/yr
$2,067
-
MMBtu
TOTAL IMPLEMENTED $31,337 $15,796 $22,103
387,785
kWh
$7,167
-
kW-mo/yr
$2,067
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs